Hand over a completed works area (QFL-IMS-QF-003). The Quantum PM signs, then the Main Contractor PM signs on this form. The completed form is then emailed to the Main Contractor addresses on the project contract.
Level / elevation
Tick one level. Area and Elevation / Roof follow that choice. Scope is the gantt task for the works being handed over.
Upload a marked-up PDF or image showing the location being handed over.
Your enrolled signature is applied here. The Main Contractor PM signs in the section below. The completed PDF is emailed when both have signed.
Sign here while you are both at the form. Draw the signature before the Quantum PM signs, or use the button once they have signed.
Draw signature